Timber Ridge Main Page
History
Maps & Directions
Board Of Directors & Officers
Covenants & By-Laws
FAQ
Architectural Requirements

ARCHITECTURAL COMMITTEE REQUIREMENTS

 

Per the Timber Ridge covenants and the Architectural Committee, the following items MUST be submitted, in duplicate, for approval. The committee has 45 days to address the plans.

 

The perimeter outline of lot, to scale.

The perimeter outline with measurements and the height of all proposed improvements.

The distance from all proposed improvements to all lot lines.

Floor plans showing the dimensions of the finished floor area.

A drawing of the front elevation showing exterior materials, colors, roof design and slope, shutters, awnings, porches, and other attachments.

 
 
 

Timber Ridge POA Pass Christian, MS 228-452-7231 poaoffice@timberridgepoa.org

Disclaimer & Privacy Notice
SunWebTech - www.sunwebtech.com